 Welcome to SHAZAM (Double Precision) v11.0 -  JUNE 201 Windows7 PAR=112400
 ...NOTE..CURRENT WORKING DIRECTORY IS: \\vmware-host\Shared Folders\Documents\Shazam\AER25\DNSP25-OldWeights
 |_SET NODOECHO
 |_SET NOCOLOR
 |_SET NOWARN
 |_**************************************************************************
 |_** THIS FILE CALCULATES ELECTRICITY DNSP MULTILATERAL TFP FOR 2006-2024 **
 |_** FOR DNSP INDUSTRY *****************************************************
 |_**************************************************************************
 |_** VARIABLES ARE IN ORDER: IDYEAR, TOTAL REVENUE, GWH, CONNECTION NO, ****
 |_** MAXIMUM DEMAND, RATCHETED MAX DEMAND, CIRCUIT LENGTH, MINS OFF SUPPLY,*
 |_** PRICE MIN OFF-SUPPLY, OPEX, PRICE OF OPEX, OHSTLine, OHDNLine, ********
 |_** UGSTCabl, UGDNCabl, MVA TRANSFORMERS EXCL FIRST STAGE, AUCOHST, *******
 |_** AUCOHDN, AUCUGST, AUCUGDN, AUC TRANSFORMERS EXCL FIRST STAGE, *********
 |_** Maximum Demand Index **************************************************
 |_**************************************************************************
 |_** WE USE LEONTIEF COST FUNCTION SHARES OF 0.11, 0.48, 0.15 AND 0.26 ON **
 |_** OUTPUTS OF GWH, RATCHETED MAX DEMAND, CONNECTION NO, CIRCUIT LENGTH ***
 |_** RELIABILITY IS INCLUDED AS 5th OUTPUT USING DNSP VCRs *****************
 |_** INPUTS ARE OPEX, OH SUBTRANS MVAKMS, OH DIST MVAKMS, UG SUBTRANS MVAKMS,
 |_** UG DIST MVAKMS, MVA TRF CAP EXCL FIRST STAGE & OTHER ASSETS ***********
 |_** WITH EXOGENOUS CAPITAL AUCs *******************************************
 |_**************************************************************************
 |_SMPL 1 19
 |_read(DINDdata.csv) IDYear Revenue Energy RMDemand CustNum CircLen CustMOS PRCMOS Opex PrOpex &
 | OHSTLine OHDNLine UGSTCabl UGDNCabl SSTranf AUCOHST AUCOHDN AUCUGST AUCUGDN SSAUCTrn MaxD MDIndex / skiplines=1
 ...NOTE..UNIT 88 IS NOW ASSIGNED TO: DINDdata.csv
 ...NOTE..   22 VARIABLES AND       19 OBSERVATIONS STARTING AT OBS       1

 |_genr VI1=Opex
 |_genr R1=PrOpex
 |_genr Q1=Energy
 |_genr Q2=RMDemand
 |_genr Q3=CustNum
 |_genr Q4=CircLen
 |_genr Q5=CustMOS
 |_genr X2=OHSTLine
 |_genr X3=OHDNLine
 |_genr X4=UGSTCabl
 |_genr X5=UGDNCabl
 |_genr X6=SSTranf
 |_genr VI2=AUCOHST
 |_genr VI3=AUCOHDN
 |_genr VI4=AUCUGST
 |_genr VI5=AUCUGDN
 |_genr VI6=SSAUCTrn
 |_GENR GR=Revenue+PRCMOS*Q5/1000
 |_GENR V1=GR*0.0858
 |_GENR V2=GR*0.3376
 |_GENR V3=GR*0.1852
 |_GENR V4=GR*0.3914
 |_GENR V5=-1*PRCMOS*Q5/1000
 |_GENR X1=VI1/R1
 |_DO #=1,5
 |_GENR P#=V#/Q#
 |_GENR SO#=V#/Revenue
 |_STAT SO# / MEAN=SO#M
 |_GENR LQ#=LOG(Q#)
 |_STAT LQ# / MEAN=LQ#M
 |_GENR LQ#L=LAG(LQ#)
 |_GENR SO#L=LAG(SO#)
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SO1          19  0.98821E-01 0.30467E-02 0.92821E-05  0.94910E-01  0.10554
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LQ1          19   11.886     0.27865E-01 0.77644E-03   11.851       11.937
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SO2          19  0.38883     0.11988E-01 0.14371E-03  0.37345      0.41526
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LQ2          19   10.489     0.50675E-01 0.25679E-02   10.355       10.551
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SO3          19  0.21331     0.65762E-02 0.43247E-04  0.20486      0.22780
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LQ3          19   16.096     0.74404E-01 0.55359E-02   15.977       16.211
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SO4          19  0.45080     0.13898E-01 0.19316E-03  0.43296      0.48144
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LQ4          19   13.503     0.22274E-01 0.49611E-03   13.467       13.537
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SO5          19 -0.15176     0.35509E-01 0.12609E-02 -0.23004     -0.10618
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LQ5          19   20.889     0.55636E-01 0.30954E-02   20.795       20.981
 EXECUTION FINISHED FOR DO LOOP  #=       5
 |_GENR TC=VI1+VI2+VI3+VI4+VI5+VI6
 |_GENR VK=VI2+VI3+VI4+VI5+VI6
 |_DO #=1,6
 |_GENR R#=VI#/X#
 |_GENR SI#=VI#/TC
 |_STAT SI# / MEAN=SI#M
 |_GENR LX#=LOG(X#)
 |_STAT LX# / MEAN=LX#M
 |_GENR LX#L=LAG(LX#)
 |_GENR SI#L=LAG(SI#)
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI1          19  0.42306     0.16380E-01 0.26831E-03  0.39519      0.45719
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX1          19   14.606     0.91264E-01 0.83291E-02   14.466       14.783
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI2          19  0.43094E-01 0.29055E-02 0.84422E-05  0.38323E-01  0.47968E-01
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX2          19   14.622     0.25401E-01 0.64523E-03   14.577       14.651
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI3          19  0.14220     0.58773E-02 0.34542E-04  0.13556      0.16169
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX3          19   13.920     0.15550E-01 0.24179E-03   13.893       13.944
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI4          19  0.21354E-01 0.15790E-02 0.24933E-05  0.18905E-01  0.23906E-01
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX4          19   12.304     0.11306     0.12783E-01   12.094       12.419
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI5          19  0.10594     0.63190E-02 0.39930E-04  0.95286E-01  0.11583
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX5          19   12.342     0.17559     0.30832E-01   12.028       12.594
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SI6          19  0.26434     0.70212E-02 0.49298E-04  0.25162      0.27649
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 LX6          19   12.019     0.11446     0.13101E-01   11.774       12.147
 EXECUTION FINISHED FOR DO LOOP  #=       6
 |_DO #=2,6
 |_GENR SK#=VI#/VK
 |_STAT SK# / MEAN=SK#M
 |_GENR SK#L=LAG(SK#)
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       2
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SK2          19  0.74643E-01 0.35789E-02 0.12809E-04  0.68216E-01  0.80380E-01
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SK3          19  0.24652     0.84031E-02 0.70612E-04  0.23202      0.26971
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SK4          19  0.37045E-01 0.29619E-02 0.87730E-05  0.32503E-01  0.41114E-01
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SK5          19  0.18352     0.71608E-02 0.51277E-04  0.17153      0.19409
 NAME        N    MEAN        ST. DEV      VARIANCE     MINIMUM      MAXIMUM
 SK6          19  0.45828     0.81982E-02 0.67211E-04  0.44786      0.47400
 EXECUTION FINISHED FOR DO LOOP  #=       6
 |_SMPL 2 19
 |_**********************************************************************
 |_** MULTILATERAL CCD OUTPUT INDEX *************************************
 |_**********************************************************************
 |_GENR LNOI=0.5*((SO1+SO1M)*(LQ1-LQ1M)+(SO2+SO2M)*(LQ2-LQ2M)+(SO3+SO3M)*(LQ3-LQ3M)+ &
 | (SO4+SO4M)*(LQ4-LQ4M)+(SO5+SO5M)*(LQ5-LQ5M))-0.5*((SO1L+SO1M)*(LQ1L-LQ1M)+(SO2L+SO2M)*(LQ2L-LQ2M)+ &
 | (SO3L+SO3M)*(LQ3L-LQ3M)+(SO4L+SO4M)*(LQ4L-LQ4M)+(SO5L+SO5M)*(LQ5L-LQ5M))
 |_GENR OI=EXP(LNOI)
 |_**********************************************************************
 |_** MULTILATERAL CCD INPUT INDEX **************************************
 |_**********************************************************************
 |_GENR LNII=0.5*((SI1+SI1M)*(LX1-LX1M)+(SI2+SI2M)*(LX2-LX2M)+(SI3+SI3M)*(LX3-LX3M)+ &
 | (SI4+SI4M)*(LX4-LX4M)+(SI5+SI5M)*(LX5-LX5M)+(SI6+SI6M)*(LX6-LX6M))- &
 | 0.5*((SI1L+SI1M)*(LX1L-LX1M)+(SI2L+SI2M)*(LX2L-LX2M)+(SI3L+SI3M)*(LX3L-LX3M)+ &
 | (SI4L+SI4M)*(LX4L-LX4M)+(SI5L+SI5M)*(LX5L-LX5M)+(SI6L+SI6M)*(LX6L-LX6M))
 |_GENR II=EXP(LNII)
 |_**********************************************************************
 |_** MULTILATERAL CCD CAPITAL INPUT INDEX ******************************
 |_**********************************************************************
 |_GENR LNKI=0.5*((SK2+SK2M)*(LX2-LX2M)+(SK3+SK3M)*(LX3-LX3M)+ &
 | (SK4+SK4M)*(LX4-LX4M)+(SK5+SK5M)*(LX5-LX5M)+(SK6+SK6M)*(LX6-LX6M))- &
 | 0.5*((SK2L+SK2M)*(LX2L-LX2M)+(SK3L+SK3M)*(LX3L-LX3M)+ &
 | (SK4L+SK4M)*(LX4L-LX4M)+(SK5L+SK5M)*(LX5L-LX5M)+(SK6L+SK6M)*(LX6L-LX6M))
 |_GENR KI=EXP(LNKI)
 |_**********************************************************************
 |_** MULTILATERAL OUTPUT CONTRIBUTIONS TO MTFP *************************
 |_**********************************************************************
 |_DO #=1,5
 |_GENR OC#=0.5*(SO#+SO#M)*(LQ#-LQ#M)-0.5*(SO#L+SO#M)*(LQ#L-LQ#M)
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 EXECUTION FINISHED FOR DO LOOP  #=       5
 |_**********************************************************************
 |_** MULTILATERAL INPUT CONTRIBUTIONS TO MTFP **************************
 |_**********************************************************************
 |_DO #=1,6
 |_GENR IC#=-1*(0.5*(SI#+SI#M)*(LX#-LX#M)-0.5*(SI#L+SI#M)*(LX#L-LX#M))
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 EXECUTION FINISHED FOR DO LOOP  #=       6
 |_**********************************************************************
 |_** MULTILATERAL CUMULATIVE INDEXES ***********************************
 |_**********************************************************************
 |_SMPL 1 19
 |_GENR OUTIND=0.0
 |_GENR INPIND=0.0
 |_GENR KIND=0.0
 |_GENR OUTIND(1)=1.0
 |_GENR INPIND(1)=1.0
 |_GENR KIND(1)=1.0
 |_DO #=2,19
 |_GENR OUTIND(#)=OUTIND(#-1)*OI(#)
 |_GENR INPIND(#)=INPIND(#-1)*II(#)
 |_GENR KIND(#)=KIND(#-1)*KI(#)
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       2
 EXECUTION FINISHED FOR DO LOOP  #=      19
 |_GENR PRODIND=OUTIND/INPIND
 |_DO #=1,5
 |_GEN1 BASEO#=Q#(1)
 |_GENR QB#=Q#/BASEO#
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 EXECUTION FINISHED FOR DO LOOP  #=       5
 |_DO #=1,6
 |_GEN1 BASE#=X#(1)
 |_GENR XB#=X#/BASE#
 |_GENR PP#=OUTIND/XB#
 |_ENDO
 EXECUTION BEGINNING FOR DO LOOP  # =       1
 EXECUTION FINISHED FOR DO LOOP  #=       6
 |_GENR PPK=OUTIND/KIND
 |_PRINT IDYear OUTIND INPIND PRODIND PP1 PPK / WIDE
       IDYEAR         OUTIND         INPIND         PRODIND        PP1            PPK
    2006.000       1.000000       1.000000       1.000000       1.000000       1.000000
    2007.000       1.035110       1.017874       1.016933       1.034836       1.004084
    2008.000       1.055740       1.088532      0.9698757      0.9266324       1.003727
    2009.000       1.056557       1.097672      0.9625435      0.9446382      0.9747693
    2010.000       1.086973       1.137294      0.9557541      0.9290755      0.9745834
    2011.000       1.097564       1.178187      0.9315703      0.8854699      0.9640274
    2012.000       1.107360       1.248384      0.8870346      0.8062267      0.9502253
    2013.000       1.106468       1.214411      0.9111152      0.8835067      0.9312988
    2014.000       1.111983       1.240111      0.8966803      0.8725291      0.9152936
    2015.000       1.118351       1.267932      0.8820280      0.8505178      0.9067112
    2016.000       1.121473       1.235321      0.9078392      0.9243076      0.8962956
    2017.000       1.143042       1.219743      0.9371175      0.9828739      0.9051086
    2018.000       1.142862       1.206354      0.9473688       1.023512      0.8956098
    2019.000       1.136815       1.216620      0.9344039       1.010858      0.8824099
    2020.000       1.138858       1.202054      0.9474259       1.056992      0.8731618
    2021.000       1.162157       1.185719      0.9801286       1.122510      0.8823265
    2022.000       1.147882       1.186676      0.9673090       1.117497      0.8667428
    2023.000       1.165979       1.231614      0.9467086       1.057980      0.8710460
    2024.000       1.173338       1.289513      0.9099082      0.9693226      0.8698733
 |_PRINT IDYear PP1 PPK PP2-PP6 / WIDE
       IDYEAR         PP1            PPK            PP2            PP3            PP4            PP5            PP6
    2006.000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000
    2007.000       1.034836       1.004084       1.031561       1.050018       1.003349      0.9786485      0.9859486
    2008.000      0.9266324       1.003727       1.053226       1.066562       1.004635      0.9881599      0.9694664
    2009.000      0.9446382      0.9747693       1.040554       1.065920      0.9942447      0.9352600      0.9327918
    2010.000      0.9290755      0.9745834       1.053640       1.092276      0.9881066      0.9201412      0.9248529
    2011.000      0.8854699      0.9640274       1.059359       1.097944      0.9643997      0.8956099      0.9112789
    2012.000      0.8062267      0.9502253       1.054999       1.103426      0.9320894      0.8717250      0.8934037
    2013.000      0.8835067      0.9312988       1.065368       1.099799      0.8894878      0.8431639      0.8704063
    2014.000      0.8725291      0.9152936       1.068762       1.099926      0.8459630      0.8200870      0.8508579
    2015.000      0.8505178      0.9067112       1.061056       1.100185      0.8743000      0.7991574      0.8404406
    2016.000      0.9243076      0.8962956       1.058313       1.102094      0.8519228      0.7802481      0.8286490
    2017.000      0.9828739      0.9051086       1.061845       1.123461      0.8470648      0.7729582      0.8412205
    2018.000       1.023512      0.8956098       1.075442       1.115811      0.8594110      0.7533904      0.8304380
    2019.000       1.010858      0.8824099       1.069435       1.109654      0.8601050      0.7302849      0.8169482
    2020.000       1.056992      0.8731618       1.064619       1.112320      0.8266256      0.7116827      0.8086337
    2021.000       1.122510      0.8823265       1.088382       1.131574      0.8474938      0.7068621      0.8174024
    2022.000       1.117497      0.8667428       1.069297       1.113120      0.8289733      0.6835010      0.8073927
    2023.000       1.057980      0.8710460       1.082230       1.129621      0.8625227      0.6792252      0.8071530
    2024.000      0.9693226      0.8698733       1.090977       1.131529      0.8530424      0.6665713      0.8082972
 |_PRINT IDYear QB1-QB5 MDIndex OUTIND / WIDE
       IDYEAR         QB1            QB2            QB3            QB4            QB5            MDINDEX        OUTIND
    2006.000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000
    2007.000       1.011183       1.032499       1.013073      0.9924484      0.8970569       1.026014       1.035110
    2008.000       1.026652       1.072861       1.026585      0.9919896      0.8954880       1.068979       1.055740
    2009.000       1.031022       1.117538       1.042804       1.001680       1.022039       1.115224       1.056557
    2010.000       1.037968       1.131459       1.055781       1.008608      0.9319754       1.113982       1.086973
    2011.000       1.018265       1.142297       1.068862       1.014696      0.9177874       1.108281       1.097564
    2012.000       1.003262       1.144575       1.081643       1.020906      0.8897302       1.027795       1.107360
    2013.000      0.9743778       1.144575       1.094708       1.019718      0.8872621       1.069943       1.106468
    2014.000      0.9562648       1.158700       1.107146       1.024051      0.9012805       1.049882       1.111983
    2015.000      0.9668646       1.159687       1.122027       1.029083      0.9056803       1.022855       1.118351
    2016.000      0.9729889       1.159969       1.137933       1.033115      0.9254768       1.081666       1.121473
    2017.000      0.9724239       1.166692       1.156950       1.037501      0.8484511       1.123800       1.143042
    2018.000      0.9669539       1.172159       1.174835       1.040264      0.8880202       1.104920       1.142862
    2019.000      0.9736213       1.177141       1.193220       1.044582      0.9724249       1.131730       1.136815
    2020.000      0.9548065       1.184078       1.207593       1.048910      0.9918622       1.142069       1.138858
    2021.000      0.9519424       1.185114       1.219827       1.052486      0.8850908       1.055921       1.162157
    2022.000      0.9602943       1.195164       1.236149       1.056314       1.019217       1.088653       1.147882
    2023.000      0.9720998       1.200210       1.251242       1.060293      0.9650725       1.110356       1.165979
    2024.000      0.9852413       1.217072       1.263362       1.063663      0.9902118       1.150381       1.173338
 |_PRINT IDYear XB1-XB6 KIND / WIDE
       IDYEAR         XB1            XB2            XB3            XB4            XB5            XB6            KIND
    2006.000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000       1.000000
    2007.000       1.000265       1.003440      0.9858025       1.031655       1.057693       1.049862       1.030900
    2008.000       1.139330       1.002387      0.9898541       1.050870       1.068390       1.088991       1.051820
    2009.000       1.118478       1.015380      0.9912159       1.062673       1.129694       1.132683       1.083905
    2010.000       1.169951       1.031636      0.9951456       1.100057       1.181311       1.175293       1.115321
    2011.000       1.239527       1.036064      0.9996544       1.138080       1.225493       1.204422       1.138520
    2012.000       1.373510       1.049631       1.003565       1.188041       1.270309       1.239485       1.165366
    2013.000       1.252360       1.038578       1.006064       1.243938       1.312281       1.271209       1.188091
    2014.000       1.274437       1.040441       1.010961       1.314459       1.355933       1.306897       1.214892
    2015.000       1.314906       1.053998       1.016512       1.279139       1.399413       1.330672       1.233415
    2016.000       1.213312       1.059680       1.017584       1.316402       1.437329       1.353375       1.251231
    2017.000       1.162959       1.076468       1.017430       1.349415       1.478789       1.358790       1.262878
    2018.000       1.116609       1.062690       1.024244       1.329820       1.516959       1.376216       1.276072
    2019.000       1.124604       1.063005       1.024477       1.321716       1.556673       1.391538       1.288307
    2020.000       1.077451       1.069733       1.023858       1.377719       1.600232       1.408373       1.304291
    2021.000       1.035320       1.067785       1.027027       1.371287       1.644108       1.421769       1.317151
    2022.000       1.027190       1.073492       1.031230       1.384703       1.679415       1.421715       1.324363
    2023.000       1.102080       1.077386       1.032186       1.351825       1.716632       1.444558       1.338597
    2024.000       1.210473       1.075493       1.036950       1.375475       1.760259       1.451618       1.348861
 |_PRINT IDYear SO1-SO5 / WIDE
       IDYEAR         SO1            SO2            SO3            SO4            SO5
    2006.000      0.1055378      0.4152631      0.2278043      0.4814395     -0.2300447
    2007.000      0.1027906      0.4044535      0.2218744      0.4689073     -0.1980259
    2008.000      0.1024749      0.4032114      0.2211930      0.4674672     -0.1943465
    2009.000      0.1036190      0.4077129      0.2236624      0.4726861     -0.2076804
    2010.000      0.1008058      0.3966436      0.2175901      0.4598528     -0.1748923
    2011.000      0.9875569E-01  0.3885772      0.2131650      0.4505009     -0.1509987
    2012.000      0.9691197E-01  0.3813226      0.2091853      0.4420903     -0.1295102
    2013.000      0.9538634E-01  0.3753197      0.2058922      0.4351307     -0.1117289
    2014.000      0.9497527E-01  0.3737022      0.2050049      0.4332555     -0.1069379
    2015.000      0.9491032E-01  0.3734467      0.2048647      0.4329592     -0.1061809
    2016.000      0.9731336E-01  0.3829020      0.2100517      0.4439213     -0.1341883
    2017.000      0.9580147E-01  0.3769531      0.2067883      0.4370244     -0.1165673
    2018.000      0.9660255E-01  0.3801051      0.2085174      0.4406787     -0.1259038
    2019.000      0.9784715E-01  0.3850023      0.2112039      0.4463563     -0.1404097
    2020.000      0.9818499E-01  0.3863316      0.2119331      0.4478975     -0.1443472
    2021.000      0.9752406E-01  0.3837310      0.2105065      0.4448825     -0.1366441
    2022.000      0.9953269E-01  0.3916344      0.2148421      0.4540454     -0.1600546
    2023.000      0.9920346E-01  0.3903390      0.2141315      0.4525435     -0.1562175
    2024.000      0.9942522E-01  0.3912116      0.2146101      0.4535551     -0.1588021
 |_PRINT IDYear SI1-SI6 / WIDE
       IDYEAR         SI1            SI2            SI3            SI4            SI5            SI6
    2006.000      0.4191465      0.4633122E-01  0.1421696      0.1890517E-01  0.1118656      0.2615819
    2007.000      0.4173350      0.4522649E-01  0.1425909      0.1893828E-01  0.1101333      0.2657760
    2008.000      0.4296936      0.4493809E-01  0.1389896      0.1892238E-01  0.1088699      0.2585864
    2009.000      0.4032252      0.4796849E-01  0.1454491      0.1994521E-01  0.1158308      0.2675812
    2010.000      0.4054681      0.4512705E-01  0.1456395      0.1933519E-01  0.1139912      0.2704390
    2011.000      0.3951852      0.4773842E-01  0.1437847      0.2168919E-01  0.1151260      0.2764764
    2012.000      0.4154270      0.4551903E-01  0.1378596      0.2160673E-01  0.1115297      0.2680579
    2013.000      0.4134596      0.4360117E-01  0.1360910      0.2264675E-01  0.1077116      0.2764900
    2014.000      0.4277856      0.4150099E-01  0.1360306      0.2187049E-01  0.1015814      0.2712310
    2015.000      0.4313323      0.4309839E-01  0.1387044      0.2325697E-01  0.1040688      0.2595392
    2016.000      0.4436889      0.4010743E-01  0.1392445      0.2172999E-01  0.1001960      0.2550331
    2017.000      0.4215515      0.4183755E-01  0.1410171      0.2253429E-01  0.1063462      0.2667135
    2018.000      0.4185414      0.4342280E-01  0.1450603      0.2390587E-01  0.1055112      0.2635584
    2019.000      0.4197487      0.4241624E-01  0.1465463      0.2346843E-01  0.1050849      0.2627354
    2020.000      0.4351322      0.4193624E-01  0.1440550      0.2263413E-01  0.1032620      0.2529804
    2021.000      0.4571876      0.3890368E-01  0.1355560      0.2103112E-01  0.9570637E-01  0.2516153
    2022.000      0.4456037      0.3838330E-01  0.1383771      0.2077196E-01  0.9528622E-01  0.2615777
    2023.000      0.4382102      0.3832299E-01  0.1429815      0.2066565E-01  0.9636146E-01  0.2634582
    2024.000      0.4005006      0.4240608E-01  0.1616923      0.2186948E-01  0.1044157      0.2691158
 |_SMPL 2 19
 |_PRINT IDYear OC1-OC5 / WIDE
       IDYEAR         OC1            OC2            OC3            OC4            OC5
    2007.000      0.1101340E-02  0.1341243E-01  0.3178488E-02 -0.3311593E-02  0.2012721E-01
    2008.000      0.1524001E-02  0.1525007E-01  0.2914482E-02 -0.1868163E-03  0.2326242E-03
    2009.000      0.4532205E-03  0.1610483E-01  0.3310577E-02  0.4395165E-02 -0.2349024E-01
    2010.000      0.6070598E-03  0.4991397E-02  0.2897990E-02  0.3306097E-02  0.1657860E-01
    2011.000     -0.1946224E-02  0.3750069E-02  0.2768725E-02  0.2801819E-02  0.2321949E-02
    2012.000     -0.1482583E-02  0.7727788E-03  0.2614818E-02  0.2779446E-02  0.4201298E-02
    2013.000     -0.2850090E-02 -0.1517214E-05  0.2583166E-02 -0.4908645E-03 -0.4668997E-04
    2014.000     -0.1815837E-02  0.4675806E-02  0.2375498E-02  0.1882198E-02 -0.2145538E-02
    2015.000      0.1068799E-02  0.3230311E-03  0.2792676E-02  0.2166533E-02 -0.6407644E-03
    2016.000      0.5959660E-03  0.1580373E-03  0.2970153E-02  0.1753878E-02 -0.2690345E-02
    2017.000     -0.4667403E-04  0.2171682E-02  0.3464344E-02  0.1864202E-02  0.1159658E-01
    2018.000     -0.5566431E-03  0.1828429E-02  0.3258822E-02  0.1201926E-02 -0.5889849E-02
    2019.000      0.6637369E-03  0.1700367E-02  0.3352685E-02  0.1891260E-02 -0.1291377E-01
    2020.000     -0.1924256E-02  0.2296372E-02  0.2566831E-02  0.1870209E-02 -0.3013782E-02
    2021.000     -0.2843890E-03  0.2930249E-03  0.2086344E-02  0.1493894E-02  0.1666362E-01
    2022.000      0.8312895E-03  0.3434819E-02  0.3018619E-02  0.1749779E-02 -0.2139410E-01
    2023.000      0.1214103E-02  0.1613091E-02  0.2560395E-02  0.1678024E-02  0.8577401E-02
    2024.000      0.1329492E-02  0.5462232E-02  0.2087771E-02  0.1450278E-02 -0.4038248E-02
 |_PRINT IDYear IC1-IC6 / WIDE
       IDYEAR         IC1            IC2            IC3            IC4            IC5            IC6
    2007.000     -0.2386086E-03 -0.1769846E-03  0.2038717E-02 -0.6243584E-03 -0.6332041E-02 -0.1238326E-01
    2008.000     -0.5463761E-01  0.4011389E-04 -0.6242168E-03 -0.3730538E-03 -0.1243829E-02 -0.1027444E-01
    2009.000      0.7498357E-02 -0.5205279E-03 -0.1256788E-03 -0.1484380E-03 -0.5323249E-02 -0.9742717E-02
    2010.000     -0.1860715E-01 -0.7440787E-03 -0.5674532E-03 -0.7490156E-03 -0.5090009E-02 -0.9701970E-02
    2011.000     -0.2354964E-01 -0.1753312E-03 -0.6621638E-03 -0.5959701E-03 -0.3974861E-02 -0.6367443E-02
    2012.000     -0.4378235E-01 -0.5879730E-03 -0.5836706E-03 -0.9261998E-03 -0.4104828E-02 -0.7888349E-02
    2013.000      0.3879624E-01  0.4614007E-03 -0.3535845E-03 -0.9917202E-03 -0.3615715E-02 -0.6705306E-02
    2014.000     -0.8039809E-02 -0.8418362E-04 -0.6757555E-03 -0.1188677E-02 -0.3525569E-02 -0.7428146E-02
    2015.000     -0.1353551E-01 -0.5529864E-03 -0.7674511E-03  0.5638352E-03 -0.3302120E-02 -0.4591558E-02
    2016.000      0.3402527E-01 -0.2135783E-03 -0.1493720E-03 -0.5912378E-03 -0.2713172E-02 -0.4302145E-02
    2017.000      0.1848490E-01 -0.6779509E-03  0.1670292E-04 -0.5694846E-03 -0.3167684E-02 -0.1395219E-02
    2018.000      0.1713031E-01  0.5351400E-03 -0.9691708E-03  0.2697722E-03 -0.2662197E-02 -0.3266796E-02
    2019.000     -0.2988128E-02 -0.5105160E-05 -0.4162460E-04  0.1533318E-03 -0.2704944E-02 -0.2887413E-02
    2020.000      0.1855660E-01 -0.2645771E-03  0.1014768E-03 -0.8841084E-03 -0.2769830E-02 -0.2695016E-02
    2021.000      0.1828245E-01  0.1074316E-03 -0.3804948E-03  0.1873803E-03 -0.2138204E-02 -0.2375955E-02
    2022.000      0.2811210E-02 -0.2120279E-03 -0.5934211E-03 -0.1914144E-03 -0.2099396E-02 -0.5212267E-03
    2023.000     -0.3072517E-01 -0.1466562E-03 -0.1751135E-03  0.5109977E-03 -0.2326855E-02 -0.4306816E-02
    2024.000     -0.3944610E-01  0.1657992E-04 -0.8826723E-03 -0.4296577E-03 -0.3550302E-02 -0.1647009E-02
 |_SMPL 1 19
 |_GENR T=TIME(0)
 |_GENR LTFP=LOG(PRODIND)
 |_GENR LQO=LOG(OUTIND)
 |_GENR LQI=LOG(INPIND)
 |_GENR LPP1=LOG(PP1)
 |_GENR LPPK=LOG(PPK)
 |_**************************************************************************
 |_** ESTIMATE TREND GROWTH RATES OVER PERIOD 2006-2024 *********************
 |_**************************************************************************

 |_OLS LQO T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        19 OBSERVATIONS     DEPENDENT VARIABLE= LQO
 ...NOTE..SAMPLE RANGE SET TO:      1,     19

  R-SQUARE =   0.8857     R-SQUARE ADJUSTED =   0.8790
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.22278E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.14926E-01
 SUM OF SQUARED ERRORS-SSE=  0.37873E-02
 MEAN OF DEPENDENT VARIABLE =  0.10438
 LOG OF THE LIKELIHOOD FUNCTION =  53.9852

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.24624E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -8.3100
  SCHWARZ (1978) CRITERION - LOG SC =              -8.2106
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.24899E-03
  HANNAN AND QUINN (1979) CRITERION =              0.25022E-03
  RICE (1984) CRITERION =                          0.25249E-03
  SHIBATA (1981) CRITERION =                       0.24130E-03
  SCHWARZ (1978) CRITERION - SC =                  0.27176E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.24604E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.29352E-01      1.       0.29352E-01           131.751
 ERROR            0.37873E-02     17.       0.22278E-03           P-VALUE
 TOTAL            0.33139E-01     18.       0.18411E-02             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.23635          2.       0.11817               530.436
 ERROR            0.37873E-02     17.       0.22278E-03           P-VALUE
 TOTAL            0.24013         19.       0.12639E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      17 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.71760E-02 0.6252E-03   11.48     0.000 0.941     0.9411     0.6875
 CONSTANT  0.32616E-01 0.7128E-02   4.576     0.000 0.743     0.0000     0.3125

 |_OLS LQI T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        19 OBSERVATIONS     DEPENDENT VARIABLE= LQI
 ...NOTE..SAMPLE RANGE SET TO:      1,     19

  R-SQUARE =   0.5323     R-SQUARE ADJUSTED =   0.5048
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.24400E-02
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.49397E-01
 SUM OF SQUARED ERRORS-SSE=  0.41481E-01
 MEAN OF DEPENDENT VARIABLE =  0.16520
 LOG OF THE LIKELIHOOD FUNCTION =  31.2463

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.26969E-02
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -5.9164
  SCHWARZ (1978) CRITERION - LOG SC =              -5.8170
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.27271E-02
  HANNAN AND QUINN (1979) CRITERION =              0.27405E-02
  RICE (1984) CRITERION =                          0.27654E-02
  SHIBATA (1981) CRITERION =                       0.26428E-02
  SCHWARZ (1978) CRITERION - SC =                  0.29765E-02
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.26948E-02

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.47219E-01      1.       0.47219E-01            19.352
 ERROR            0.41481E-01     17.       0.24400E-02           P-VALUE
 TOTAL            0.88700E-01     18.       0.49278E-02             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.56576          2.       0.28288               115.933
 ERROR            0.41481E-01     17.       0.24400E-02           P-VALUE
 TOTAL            0.60724         19.       0.31960E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      17 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.91016E-02 0.2069E-02   4.399     0.000 0.730     0.7296     0.5509
 CONSTANT  0.74186E-01 0.2359E-01   3.145     0.006 0.606     0.0000     0.4491

 |_OLS LTFP T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        19 OBSERVATIONS     DEPENDENT VARIABLE= LTFP
 ...NOTE..SAMPLE RANGE SET TO:      1,     19

  R-SQUARE =   0.0767     R-SQUARE ADJUSTED =   0.0224
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.14972E-02
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.38694E-01
 SUM OF SQUARED ERRORS-SSE=  0.25453E-01
 MEAN OF DEPENDENT VARIABLE = -0.60826E-01
 LOG OF THE LIKELIHOOD FUNCTION =  35.8861

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.16548E-02
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -6.4048
  SCHWARZ (1978) CRITERION - LOG SC =              -6.3054
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.16734E-02
  HANNAN AND QUINN (1979) CRITERION =              0.16816E-02
  RICE (1984) CRITERION =                          0.16969E-02
  SHIBATA (1981) CRITERION =                       0.16217E-02
  SCHWARZ (1978) CRITERION - SC =                  0.18264E-02
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.16535E-02

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.21136E-02      1.       0.21136E-02             1.412
 ERROR            0.25453E-01     17.       0.14972E-02           P-VALUE
 TOTAL            0.27567E-01     18.       0.15315E-02             0.251

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.72410E-01      2.       0.36205E-01            24.181
 ERROR            0.25453E-01     17.       0.14972E-02           P-VALUE
 TOTAL            0.97863E-01     19.       0.51507E-02             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      17 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.19256E-02 0.1621E-02  -1.188     0.251-0.277    -0.2769     0.3166
 CONSTANT -0.41569E-01 0.1848E-01  -2.250     0.038-0.479     0.0000     0.6834

 |_OLS LPP1 T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        19 OBSERVATIONS     DEPENDENT VARIABLE= LPP1
 ...NOTE..SAMPLE RANGE SET TO:      1,     19

  R-SQUARE =   0.2235     R-SQUARE ADJUSTED =   0.1778
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.69543E-02
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.83392E-01
 SUM OF SQUARED ERRORS-SSE=  0.11822
 MEAN OF DEPENDENT VARIABLE = -0.36120E-01
 LOG OF THE LIKELIHOOD FUNCTION =  21.2966

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.76863E-02
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -4.8691
  SCHWARZ (1978) CRITERION - LOG SC =              -4.7697
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.77724E-02
  HANNAN AND QUINN (1979) CRITERION =              0.78106E-02
  RICE (1984) CRITERION =                          0.78815E-02
  SHIBATA (1981) CRITERION =                       0.75322E-02
  SCHWARZ (1978) CRITERION - SC =                  0.84830E-02
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.76803E-02

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.34028E-01      1.       0.34028E-01             4.893
 ERROR            0.11822         17.       0.69543E-02           P-VALUE
 TOTAL            0.15225         18.       0.84584E-02             0.041

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.58817E-01      2.       0.29408E-01             4.229
 ERROR            0.11822         17.       0.69543E-02           P-VALUE
 TOTAL            0.17704         19.       0.93178E-02             0.032


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      17 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.77265E-02 0.3493E-02   2.212     0.041 0.473     0.4728    -2.1391
 CONSTANT -0.11338     0.3983E-01  -2.847     0.011-0.568     0.0000     3.1391

 |_OLS LPPK T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        19 OBSERVATIONS     DEPENDENT VARIABLE= LPPK
 ...NOTE..SAMPLE RANGE SET TO:      1,     19

  R-SQUARE =   0.9439     R-SQUARE ADJUSTED =   0.9406
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.16437E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.12821E-01
 SUM OF SQUARED ERRORS-SSE=  0.27942E-02
 MEAN OF DEPENDENT VARIABLE = -0.79719E-01
 LOG OF THE LIKELIHOOD FUNCTION =  56.8742

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.18167E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -8.6141
  SCHWARZ (1978) CRITERION - LOG SC =              -8.5147
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.18370E-03
  HANNAN AND QUINN (1979) CRITERION =              0.18461E-03
  RICE (1984) CRITERION =                          0.18628E-03
  SHIBATA (1981) CRITERION =                       0.17803E-03
  SCHWARZ (1978) CRITERION - SC =                  0.20050E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.18153E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.46995E-01      1.       0.46995E-01           285.915
 ERROR            0.27942E-02     17.       0.16437E-03           P-VALUE
 TOTAL            0.49789E-01     18.       0.27661E-02             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.16774          2.       0.83871E-01           510.265
 ERROR            0.27942E-02     17.       0.16437E-03           P-VALUE
 TOTAL            0.17054         19.       0.89756E-02             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      17 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.90800E-02 0.5370E-03  -16.91     0.000-0.972    -0.9715     1.1390
 CONSTANT  0.11082E-01 0.6123E-02   1.810     0.088 0.402     0.0000    -0.1390
 |_SMPL 1 7
 |_**************************************************************************
 |_** ESTIMATE TREND GROWTH RATES OVER PERIOD 2006-2012 *********************
 |_**************************************************************************

 |_OLS LQO T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
         7 OBSERVATIONS     DEPENDENT VARIABLE= LQO
 ...NOTE..SAMPLE RANGE SET TO:      1,      7

  R-SQUARE =   0.9472     R-SQUARE ADJUSTED =   0.9367
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.81380E-04
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.90211E-02
 SUM OF SQUARED ERRORS-SSE=  0.40690E-03
 MEAN OF DEPENDENT VARIABLE =  0.60319E-01
 LOG OF THE LIKELIHOOD FUNCTION =  24.2024

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.10463E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -9.1814
  SCHWARZ (1978) CRITERION - LOG SC =              -9.1969
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.11393E-03
  HANNAN AND QUINN (1979) CRITERION =              0.85035E-04
  RICE (1984) CRITERION =                          0.13563E-03
  SHIBATA (1981) CRITERION =                       0.91344E-04
  SCHWARZ (1978) CRITERION - SC =                  0.10135E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.10293E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.73051E-02      1.       0.73051E-02            89.765
 ERROR            0.40690E-03      5.       0.81380E-04           P-VALUE
 TOTAL            0.77119E-02      6.       0.12853E-02             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.32774E-01      2.       0.16387E-01           201.365
 ERROR            0.40690E-03      5.       0.81380E-04           P-VALUE
 TOTAL            0.33181E-01      7.       0.47401E-02             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR       5 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.16152E-01 0.1705E-02   9.474     0.000 0.973     0.9733     1.0711
 CONSTANT -0.42896E-02 0.7624E-02 -0.5626     0.598-0.244     0.0000    -0.0711

 |_OLS LQI T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
         7 OBSERVATIONS     DEPENDENT VARIABLE= LQI
 ...NOTE..SAMPLE RANGE SET TO:      1,      7

  R-SQUARE =   0.9743     R-SQUARE ADJUSTED =   0.9692
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.18879E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.13740E-01
 SUM OF SQUARED ERRORS-SSE=  0.94393E-03
 MEAN OF DEPENDENT VARIABLE =  0.10146
 LOG OF THE LIKELIHOOD FUNCTION =  21.2572

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.24272E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -8.3399
  SCHWARZ (1978) CRITERION - LOG SC =              -8.3554
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.26430E-03
  HANNAN AND QUINN (1979) CRITERION =              0.19727E-03
  RICE (1984) CRITERION =                          0.31464E-03
  SHIBATA (1981) CRITERION =                       0.21190E-03
  SCHWARZ (1978) CRITERION - SC =                  0.23512E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.23879E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.35850E-01      1.       0.35850E-01           189.896
 ERROR            0.94393E-03      5.       0.18879E-03           P-VALUE
 TOTAL            0.36794E-01      6.       0.61323E-02             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.10791          2.       0.53954E-01           285.794
 ERROR            0.94393E-03      5.       0.18879E-03           P-VALUE
 TOTAL            0.10885          7.       0.15550E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR       5 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.35782E-01 0.2597E-02   13.78     0.000 0.987     0.9871     1.4107
 CONSTANT -0.41668E-01 0.1161E-01  -3.588     0.016-0.849     0.0000    -0.4107

 |_OLS LTFP T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
         7 OBSERVATIONS     DEPENDENT VARIABLE= LTFP
 ...NOTE..SAMPLE RANGE SET TO:      1,      7

  R-SQUARE =   0.8794     R-SQUARE ADJUSTED =   0.8553
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.29597E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.17204E-01
 SUM OF SQUARED ERRORS-SSE=  0.14798E-02
 MEAN OF DEPENDENT VARIABLE = -0.41140E-01
 LOG OF THE LIKELIHOOD FUNCTION =  19.6835

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.38053E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -7.8903
  SCHWARZ (1978) CRITERION - LOG SC =              -7.9058
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.41435E-03
  HANNAN AND QUINN (1979) CRITERION =              0.30926E-03
  RICE (1984) CRITERION =                          0.49328E-03
  SHIBATA (1981) CRITERION =                       0.33221E-03
  SCHWARZ (1978) CRITERION - SC =                  0.36861E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.37435E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.10789E-01      1.       0.10789E-01            36.454
 ERROR            0.14798E-02      5.       0.29597E-03           P-VALUE
 TOTAL            0.12269E-01      6.       0.20448E-02             0.002

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.22637E-01      2.       0.11318E-01            38.242
 ERROR            0.14798E-02      5.       0.29597E-03           P-VALUE
 TOTAL            0.24117E-01      7.       0.34452E-02             0.001


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR       5 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.19630E-01 0.3251E-02  -6.038     0.002-0.938    -0.9378     1.9086
 CONSTANT  0.37378E-01 0.1454E-01   2.571     0.050 0.755     0.0000    -0.9086

 |_OLS LPP1 T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
         7 OBSERVATIONS     DEPENDENT VARIABLE= LPP1
 ...NOTE..SAMPLE RANGE SET TO:      1,      7

  R-SQUARE =   0.8202     R-SQUARE ADJUSTED =   0.7842
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.14291E-02
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.37804E-01
 SUM OF SQUARED ERRORS-SSE=  0.71457E-02
 MEAN OF DEPENDENT VARIABLE = -0.72786E-01
 LOG OF THE LIKELIHOOD FUNCTION =  14.1725

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.18375E-02
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -6.3157
  SCHWARZ (1978) CRITERION - LOG SC =              -6.3312
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.20008E-02
  HANNAN AND QUINN (1979) CRITERION =              0.14933E-02
  RICE (1984) CRITERION =                          0.23819E-02
  SHIBATA (1981) CRITERION =                       0.16041E-02
  SCHWARZ (1978) CRITERION - SC =                  0.17799E-02
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.18077E-02

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.32593E-01      1.       0.32593E-01            22.806
 ERROR            0.71457E-02      5.       0.14291E-02           P-VALUE
 TOTAL            0.39738E-01      6.       0.66230E-02             0.005

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.69677E-01      2.       0.34839E-01            24.377
 ERROR            0.71457E-02      5.       0.14291E-02           P-VALUE
 TOTAL            0.76823E-01      7.       0.10975E-01             0.003


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR       5 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.34118E-01 0.7144E-02  -4.776     0.005-0.906    -0.9056     1.8750
 CONSTANT  0.63685E-01 0.3195E-01   1.993     0.103 0.665     0.0000    -0.8750

 |_OLS LPPK T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
         7 OBSERVATIONS     DEPENDENT VARIABLE= LPPK
 ...NOTE..SAMPLE RANGE SET TO:      1,      7

  R-SQUARE =   0.8780     R-SQUARE ADJUSTED =   0.8536
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.69217E-04
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.83197E-02
 SUM OF SQUARED ERRORS-SSE=  0.34609E-03
 MEAN OF DEPENDENT VARIABLE = -0.18742E-01
 LOG OF THE LIKELIHOOD FUNCTION =  24.7690

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.88994E-04
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -9.3433
  SCHWARZ (1978) CRITERION - LOG SC =              -9.3588
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.96904E-04
  HANNAN AND QUINN (1979) CRITERION =              0.72327E-04
  RICE (1984) CRITERION =                          0.11536E-03
  SHIBATA (1981) CRITERION =                       0.77693E-04
  SCHWARZ (1978) CRITERION - SC =                  0.86207E-04
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.87550E-04

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.24902E-02      1.       0.24902E-02            35.976
 ERROR            0.34609E-03      5.       0.69217E-04           P-VALUE
 TOTAL            0.28363E-02      6.       0.47271E-03             0.002

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.49491E-02      2.       0.24746E-02            35.750
 ERROR            0.34609E-03      5.       0.69217E-04           P-VALUE
 TOTAL            0.52952E-02      7.       0.75646E-03             0.001


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR       5 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.94306E-02 0.1572E-02  -5.998     0.002-0.937    -0.9370     2.0127
 CONSTANT  0.18980E-01 0.7031E-02   2.699     0.043 0.770     0.0000    -1.0127
 |_SMPL 7 19
 |_**************************************************************************
 |_** ESTIMATE TREND GROWTH RATES OVER PERIOD 2012-2024 *********************
 |_**************************************************************************
 |_GENR T=TIME(0)

 |_OLS LQO T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        13 OBSERVATIONS     DEPENDENT VARIABLE= LQO
 ...NOTE..SAMPLE RANGE SET TO:      7,     19

  R-SQUARE =   0.9098     R-SQUARE ADJUSTED =   0.9016
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.38068E-04
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.61699E-02
 SUM OF SQUARED ERRORS-SSE=  0.41875E-03
 MEAN OF DEPENDENT VARIABLE =  0.12791
 LOG OF THE LIKELIHOOD FUNCTION =  48.7845

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.43925E-04
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -10.035
  SCHWARZ (1978) CRITERION - LOG SC =              -9.9486
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.44989E-04
  HANNAN AND QUINN (1979) CRITERION =              0.43041E-04
  RICE (1984) CRITERION =                          0.46528E-04
  SHIBATA (1981) CRITERION =                       0.42123E-04
  SCHWARZ (1978) CRITERION - SC =                  0.47795E-04
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.43817E-04

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.42245E-02      1.       0.42245E-02           110.973
 ERROR            0.41875E-03     11.       0.38068E-04           P-VALUE
 TOTAL            0.46433E-02     12.       0.38694E-03             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.21693          2.       0.10847              2849.285
 ERROR            0.41875E-03     11.       0.38068E-04           P-VALUE
 TOTAL            0.21735         13.       0.16719E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      11 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.48179E-02 0.4573E-03   10.53     0.000 0.954     0.9538     0.4896
 CONSTANT  0.65283E-01 0.6187E-02   10.55     0.000 0.954     0.0000     0.5104

 |_OLS LQI T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        13 OBSERVATIONS     DEPENDENT VARIABLE= LQI
 ...NOTE..SAMPLE RANGE SET TO:      7,     19

  R-SQUARE =   0.0219     R-SQUARE ADJUSTED =  -0.0670
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.64223E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.25342E-01
 SUM OF SQUARED ERRORS-SSE=  0.70645E-02
 MEAN OF DEPENDENT VARIABLE =  0.20388
 LOG OF THE LIKELIHOOD FUNCTION =  30.4183

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.74104E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -7.2099
  SCHWARZ (1978) CRITERION - LOG SC =              -7.1230
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.75900E-03
  HANNAN AND QUINN (1979) CRITERION =              0.72613E-03
  RICE (1984) CRITERION =                          0.78495E-03
  SHIBATA (1981) CRITERION =                       0.71064E-03
  SCHWARZ (1978) CRITERION - SC =                  0.80634E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.73921E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.15811E-03      1.       0.15811E-03             0.246
 ERROR            0.70645E-02     11.       0.64223E-03           P-VALUE
 TOTAL            0.72227E-02     12.       0.60189E-03             0.630

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.54054          2.       0.27027               420.833
 ERROR            0.70645E-02     11.       0.64223E-03           P-VALUE
 TOTAL            0.54761         13.       0.42124E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      11 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.93207E-03 0.1878E-02 -0.4962     0.630-0.148    -0.1480    -0.0594
 CONSTANT  0.21600     0.2541E-01   8.500     0.000 0.932     0.0000     1.0594

 |_OLS LTFP T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        13 OBSERVATIONS     DEPENDENT VARIABLE= LTFP
 ...NOTE..SAMPLE RANGE SET TO:      7,     19

  R-SQUARE =   0.4597     R-SQUARE ADJUSTED =   0.4105
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.64304E-03
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.25358E-01
 SUM OF SQUARED ERRORS-SSE=  0.70735E-02
 MEAN OF DEPENDENT VARIABLE = -0.75968E-01
 LOG OF THE LIKELIHOOD FUNCTION =  30.4101

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.74197E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -7.2087
  SCHWARZ (1978) CRITERION - LOG SC =              -7.1217
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.75996E-03
  HANNAN AND QUINN (1979) CRITERION =              0.72704E-03
  RICE (1984) CRITERION =                          0.78594E-03
  SHIBATA (1981) CRITERION =                       0.71153E-03
  SCHWARZ (1978) CRITERION - SC =                  0.80736E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.74015E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.60172E-02      1.       0.60172E-02             9.357
 ERROR            0.70735E-02     11.       0.64304E-03           P-VALUE
 TOTAL            0.13091E-01     12.       0.10909E-02             0.011

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.81042E-01      2.       0.40521E-01            63.014
 ERROR            0.70735E-02     11.       0.64304E-03           P-VALUE
 TOTAL            0.88115E-01     13.       0.67781E-02             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      11 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.57499E-02 0.1880E-02   3.059     0.011 0.678     0.6780    -0.9840
 CONSTANT -0.15072     0.2543E-01  -5.927     0.000-0.873     0.0000     1.9840

 |_OLS LPP1 T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        13 OBSERVATIONS     DEPENDENT VARIABLE= LPP1
 ...NOTE..SAMPLE RANGE SET TO:      7,     19

  R-SQUARE =   0.6937     R-SQUARE ADJUSTED =   0.6659
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.37530E-02
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.61262E-01
 SUM OF SQUARED ERRORS-SSE=  0.41283E-01
 MEAN OF DEPENDENT VARIABLE = -0.30167E-01
 LOG OF THE LIKELIHOOD FUNCTION =  18.9435

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.43304E-02
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -5.4446
  SCHWARZ (1978) CRITERION - LOG SC =              -5.3576
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.44354E-02
  HANNAN AND QUINN (1979) CRITERION =              0.42432E-02
  RICE (1984) CRITERION =                          0.45870E-02
  SHIBATA (1981) CRITERION =                       0.41527E-02
  SCHWARZ (1978) CRITERION - SC =                  0.47120E-02
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.43197E-02

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.93496E-01      1.       0.93496E-01            24.912
 ERROR            0.41283E-01     11.       0.37530E-02           P-VALUE
 TOTAL            0.13478         12.       0.11232E-01             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.10533          2.       0.52663E-01            14.032
 ERROR            0.41283E-01     11.       0.37530E-02           P-VALUE
 TOTAL            0.14661         13.       0.11278E-01             0.001


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      11 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T         0.22665E-01 0.4541E-02   4.991     0.000 0.833     0.8329    -9.7672
 CONSTANT -0.32481     0.6143E-01  -5.288     0.000-0.847     0.0000    10.7672

 |_OLS LPPK T

 REQUIRED MEMORY IS PAR=      31 CURRENT PAR=  112400
  OLS ESTIMATION
        13 OBSERVATIONS     DEPENDENT VARIABLE= LPPK
 ...NOTE..SAMPLE RANGE SET TO:      7,     19

  R-SQUARE =   0.8874     R-SQUARE ADJUSTED =   0.8771
 VARIANCE OF THE ESTIMATE-SIGMA**2 =  0.97819E-04
 STANDARD ERROR OF THE ESTIMATE-SIGMA =  0.98903E-02
 SUM OF SQUARED ERRORS-SSE=  0.10760E-02
 MEAN OF DEPENDENT VARIABLE = -0.11035
 LOG OF THE LIKELIHOOD FUNCTION =  42.6502

 MODEL SELECTION TESTS - SEE JUDGE ET AL. (1985,P.242)
  AKAIKE (1969) FINAL PREDICTION ERROR - FPE =     0.11287E-03
     (FPE IS ALSO KNOWN AS AMEMIYA PREDICTION CRITERION - PC)
  AKAIKE (1973) INFORMATION CRITERION - LOG AIC =  -9.0918
  SCHWARZ (1978) CRITERION - LOG SC =              -9.0048
 MODEL SELECTION TESTS - SEE RAMANATHAN (1998,P.165)
  CRAVEN-WAHBA (1979)
     GENERALIZED CROSS VALIDATION - GCV =          0.11560E-03
  HANNAN AND QUINN (1979) CRITERION =              0.11060E-03
  RICE (1984) CRITERION =                          0.11956E-03
  SHIBATA (1981) CRITERION =                       0.10824E-03
  SCHWARZ (1978) CRITERION - SC =                  0.12281E-03
  AKAIKE (1974) INFORMATION CRITERION - AIC =      0.11259E-03

                      ANALYSIS OF VARIANCE - FROM MEAN
                       SS         DF             MS                 F
 REGRESSION       0.84760E-02      1.       0.84760E-02            86.650
 ERROR            0.10760E-02     11.       0.97819E-04           P-VALUE
 TOTAL            0.95520E-02     12.       0.79600E-03             0.000

                      ANALYSIS OF VARIANCE - FROM ZERO
                       SS         DF             MS                 F
 REGRESSION       0.16677          2.       0.83386E-01           852.448
 ERROR            0.10760E-02     11.       0.97819E-04           P-VALUE
 TOTAL            0.16785         13.       0.12911E-01             0.000


 VARIABLE   ESTIMATED  STANDARD   T-RATIO        PARTIAL STANDARDIZED ELASTICITY
   NAME    COEFFICIENT   ERROR      11 DF   P-VALUE CORR. COEFFICIENT  AT MEANS
 T        -0.68243E-02 0.7331E-03  -9.309     0.000-0.942    -0.9420     0.8040
 CONSTANT -0.21631E-01 0.9917E-02  -2.181     0.052-0.549     0.0000     0.1960
 |_STOP

